| Item | Type | Physical Properties | Color | Density | Open Time | Package | Package/ kg |
|---|
| Specification | Single-component | Liquid | Red and can booking | 1.45-1.55kg/L | 4h | Metal Barrel | 25kg |
Technical Standard
Remarks: The data were tested under standard experimental conditions (temperature 23℃±2℃, relative humidity 50%±10%).
| No | Appearance Items | Standard |
|
|
|
| Test Method |
|---|
| 1 |
| Ⅰ | Ⅱ | Ⅲ | Ⅳ | Ⅴ | -- |
| 2 | Tensile strength(Mpa) ≥ | 3.0 | 4.0 | 5.0 | 5.0 | 6.0 | ASTM D412 |
| 3 | Break elongation % ≥ | 800% | 600% | 500% | 1000% | 500% | ASTM D412 |
| 4 | Tear Strength (N/mm) ≥ | 20 | 26 | 28 | 28 | 32 | ASTM D624 |
| 5 | Low-temperature foldability | -35℃ | -35℃ | -35℃ | -40℃ | -35℃ | ASTM D2136 |
| 6 | Unpermeability | Pass | Pass | Pass | Pass | Pass | 0.3Mpa,120Min |
| 7 | Soild Content ( % ) ≥ | 90% | 89% | 89% | 95% | 89% | ASTM C836 |
| 8 | Surface dry time ( h ) ≤ | 4 | 3.5 | 3.5 | 4.5 | 3.5 | 12 hours |
| 9 | Full dry time ( h ) ≤ | 11 | 10 | 9.5 | 11 | 9 | 24 hours |
| 10 | Dynamic viscosity 23℃ ( mpa.s ) | 4000 | 5500 | 6000 | 10000 | 6000 | Spindle:3# Speed:12/6 rpm |
| 11 | Shore A Hardness | 55±5 | 65±5 | 65±5 | 60±5 | 70±5 | ASTM2240 |
| 12 | Density ( g/cm 3 ) | 1.45 | 1.40 | 1.36 | 1.30 | 1.33 | ISO2811-1:2016 |
| 13 | Pull of adhesive | 1.5 | 2.0 | 2.0 | 2.0 | 2.5 | ASTM D 7234 |
Product features
- Single component, instant use and easy to apply
- Strong bonding force: it has good bonding force with the base layer and does not need base layer treatment agent; after filming, it is resistant to water immersion for long.
- Coating film has good water resistance, good corrosion resistance and good bacteria resistance.
- The coating film is compact, and free from needle holes and bubbles.
- The PU coating film has high tensile strength, good elongation and excellent high and low temperature resistance.
- Color adjustable, and able to meet personalized requirements of clients for surface colors;
USAGE
Brush 1mm , use 1.6-1.7 kg/L
Applicable Scope
Applicable to waterproof engineering such as non-exposed roofs, underground engineering, bath room, balcony, water pool, and parking lot; applicable to waterproofing work such as parts with complex structure and crossed pipes;
Notes: in case of need for dilution, please use the diluents specified by Hongyuan or contact technicians of Hongyuan;
Construction technology
Construction Process
Check the construction preparation → basic treatment → node location additional waterproof layer construction → large surface coating Biogo-S coating waterproof layer → close the head position check seal → coating waterproof layer quality inspection and acceptance → protective layer construction.
Key points of construction
- Base cleaning: waterproof base should be smooth, firm, dry, no sharp concave and convex, honeycomb, hemp and peeling, no oil, no floating ash, on cracks, base deformation joints, pipe roots left in the groove should be filled with sealing materials and do additional waterproof treatment, smooth solid base without coating base treatment agent.
- Details of additional waterproof layer: internal and external Angle, tube root, basic details such as deformation seam, should undertake additional waterproof layer construction first, can increase use 2 to 4 times (thickness is not less than 1 mm), if you want to clip shop when reinforced material must be soaked, carcass deformation joint parts should be put a layer of polyester nonwoven, increase more waterproof coating,and form additional waterproof layer empty shop.
- Large surface waterproof coating construction: select plastic scraper to scrap evenly, should be divided into 2-3 times.When there is no base treating agent, the first time should be thin coated to close the base pores. After coating, it should be fully cured until the finger contact is basically non-stick and then coated for a second time. The general interval is 12h, and the second time should be vertical with the first time.
- Retracting and edge sealing: check the position of retracting head, apply edge retracting coating.
- Construction of protection and isolation layer: after the waterproof coating film is finally completed, and passed the quality inspection (closed water test), can process the construction according to the relevant specifications or design requirements.
Precautions
- No work is allowed to be carried out in snowy and rainy days or days with wind being grade 5 or higher ,The ambient temperature of the work shall not be lower than 5℃,not be higher than 35℃.
- After application is completed , materials protection should be performed .
- Construction site No smoking ,No fire ,Pay attention to the ventilation. To protect the waterproof performance of PU film .
- Cannot add diluent .
Transport and Storage
- The storage site should be protected against insolation and rain and should be well ventilated , Far away fire , the storage temperature shall be 5℃-40℃.
- The storage period is one year starting from the date of products in the case of normal storage and transportation conditions.